What
is the process?
1. Work with an Greatland Steel Buildings representative
to design a building to suit your needs.
2. The design is sent to engineering
for approval.
3. Apply for a permit to build your building.
Permit
regulations vary by County and State, start investigating the requirements in
your area as soon as you have decided to add a building to your property.
4. Make arrangements to have the building erected and any concrete work done.
5. Plans return from engineering with stamp, your representative orders your building.
6. Building is delivered to your site.
How
long does the process take?
1. Engineering Package - 7 to 10 working days.
2. Permit approval - 2 to 3 weeks.
Check
with your local building department for lead times in your area to get permit
approval.
3. Building Delivery - 6 to 7 weeks.
Are
there other things I need to think about?
1. Snow loading, wind speed,
exposure, soil density variances, etc.
2. Aesthetics.
Windows
Trim
Siding
Choices
What clearances are needed for the
door selected?
1. For overhead doors you need 18" additional height
for door track and 3" on each side for the side door track.
What
are you putting in the building? If your boat and trailer have a combined height
of 10 feet, you need to plan on a building with 12 foot doors
How
can the Multibuild program help me?
1. Multibuild allows your
representative to accurately design a building to your specifications.
The
program instantly calculates the price of the finished product (no more waiting
days or weeks for a bid). With Multibuild we can design the building which
fits your needs AND budget too!